Turnkey Supply-Exhaust Ventilation: Office, Restaurant, Plant

Same method — calc and balance — different accents by building type.

Turnkey supply-exhaust means air-change calc, duct design, fabrication, AHU install, balancing and handover reports. Without supply/exhaust balance doors slam, odors travel and rooms feel stuffy even with AC running.

Office: people-based supply, CO₂ in meeting rooms, quiet grilles, tie-in to ducted or VRF cooling. Restaurant: grease kitchen exhaust plus makeup air to the hall. Plant: local hoods, filtration and 24/7 duty.

Stages stay the same; codes, silencers and duct materials change — kitchen grease ducts need a different cleaning regime.

In-house Tashkent fabrication shortens lead times and custom fittings. One contract for design and install removes the usual designer-vs-installer gap.

Offices: night setback and CO₂ control beat 24/7 max airflow.

Restaurants: lock makeup air before ordering the hood.

Plants: local hoods plus general exhaust — not one roof fan alone.

Demand a balancing report with grille numbers at handover.

Aurum Prodest installs turnkey AHU ventilation across Uzbekistan. Telegram @V_Sergey1980, +998 93 389 58 59.

Need a quote or install?

Leave a request — an engineer will reply during business hours.

More articles

Ventilation

Warehouse Ventilation: Standards, Layouts and Common Mistakes

Ventilation

How Much Does Ventilation Installation Cost in Tashkent — 2026

VRF / VRV

Turnkey VRF / VRV Installation: Stages, Timelines and Mistakes

Air conditioning

Air Conditioning System Design: What a Proper Project Includes

Air conditioning

Ducted Air Conditioner Installation: From Load Calc to Startup

Fabrication

Custom Air Ducts in Tashkent: Lead Times, Sizes, Delivery

Air conditioning

Workshop Heat Balance: Sizing Industrial Air Conditioning

Air conditioning

Air Handling Units for Shopping Malls and Retail Centers

VRF / VRV

Chiller-Fan Coil vs VRF for a Business Center

Air conditioning

Rooftop Unit vs Central System for a Warehouse

Ventilation

Supply Air Handling for Offices in +40°C Tashkent Heat: Cooling Outdoor Air

Ventilation

Healthcare Ventilation: Requirements, Filters and Pressure Zones

Ventilation

Upgrading Legacy Ventilation on an Industrial Site

Ventilation

Heat Recovery in Supply Ventilation: Does It Pay Off in Uzbekistan?

Ventilation

Dusty Shop Ventilation: Filtration and Local Exhaust

Ventilation

Supply and Exhaust Ventilation in Manufacturing: Air Change Rates and Standards

Air conditioning

Why Your AC Is Noisy and How to Fix It

Service

Refrigerant Leak: Signs and What to Do

Ventilation

Restaurant Ventilation in Tashkent: Kitchen and Hall

Air conditioning

How Much Does AC Installation Cost in Tashkent — 2026

Air conditioning

How to Cut AC Electricity Bills

Air conditioning

How to Choose a Split AC for an Apartment in Tashkent

Ventilation

Office Ventilation Design: Where to Start

Air conditioning

Ducted Air Conditioners: When They Beat Wall Splits

VRF / VRV

VRF/VRV for Offices and Hotels: When Multizone Pays Off

Fabrication

Ductwork Fabrication in Tashkent: In-House Shop vs Subcontract

Ventilation

Ventilation Installation: Steps from Design to Commissioning

Air conditioning

Industrial Air Conditioning for Plants and Warehouses

Air conditioning

Column Air Conditioners for Halls and Retail

Service

AC Maintenance Before Summer: Checklist

Heating

Heating Equipment for Winter: Coils and Heaters