07 · Design

Air-conditioning system design

Air-conditioning system design Design · 07

Industrial air-conditioning design starts with a survey, not a chiller brochure. Aurum Prodest calculates loads, chooses chiller–fan coil, central AHU or VRF, and issues drawings you can install from without rebuilding the roof.

Industrial cooling is not “kW per shopfront square”. We count people, lighting, process, sun and ventilation. 24/7 warehouses and Tashkent peak summer get a margin — without doubling the plant “just in case” and blowing the electrical supply.

  • Survey and heat-load calc
  • Scheme: chiller-FCU, central AHU, VRF
  • Hydraulics, runs, roof load

By the numbers

12+
years on market
500+
projects delivered
50+
specialists
5yr
warranty

About the service

Industrial cooling is not “kW per shopfront square”. We count people, lighting, process, sun and ventilation. 24/7 warehouses and Tashkent peak summer get a margin — without doubling the plant “just in case” and blowing the electrical supply.

Chiller–fan coil when there are many zones on water; central AHU when one air handler serves a volume; VRF when the building is cut into rooms. Hydraulics, pipe lengths, roof loads and service space are in the set, or install stops at the structural engineer.

Working documents: equipment plans, pipe axonometric, spec, electrical and controls assignments, isolation details. Our duct shop is tied to fan-coil and grille layout so HVAC is one pack.

The estimate follows the spec: a chiller brand swap is a visible delta. Live factories get staged design. Supervision is optional if another installer builds it.

The output is a file a crew can pump and wire from — 500+ sites since 2012. Typical mistakes (short pipe, forgotten drain, no service to the chiller) are already bans in our details. Install workmanship after our design: 5 years.

Brands

In industry, class equals downtime risk and ownership cost. Pros/cons by segment for plant, warehouse, or mall.

A brief comparison by class and use case — we match equipment to budget and site

Swipe the table sideways →

Brand Class Pros Cons
Daikin Premium Range scale and large-plant experience High ownership cost at entry
Mitsubishi Electric Premium Reliability in continuous duty Expensive for non-critical zones
Trane Premium Industrial premium chillers/central plant Long leads and strict budgets
Carrier Mid-range Capacity + standards + workable quote Not always top for comfort noise
York Mid-range Typical industrial loads Less premium line flexibility
Climaveneta Mid-range Common CIS commercial pick Depends on local support
Systemair Mid-range Handy in an AHU package Not the #1 “heavy chiller” brand

Specs and standards

Climate Tashkent peak heat in the calc
Duty office / 24/7 process
Schemes chiller-FCU, central AHU, VRF
Sketch from 5 working days
Mid-size WD 2–6 weeks
Follow-on install 5-year work warranty

What's included

  • 01 Survey and heat-load calc
  • 02 Scheme: chiller-FCU, central AHU, VRF
  • 03 Hydraulics, runs, roof load
  • 04 Plans, spec, trade assignments
  • 05 In-house duct coordination
  • 06 Staged programme for live plants
  • 07 Estimate tied to spec
  • 08 Supervision or install from our design

How we work

  1. 01 Survey and loads
  2. 02 Schematic sign-off
  3. 03 Working drawings and spec
  4. 04 Estimate and deliveries
  5. 05 Release to install
  6. 06 Supervision at key nodes

Advantages

Experienced specialists
Work warranty
Certified equipment
Same-day site visit
Transparent pricing
In-house production

FAQ

What is in AC system design?

Survey, loads, scheme, spec, estimate and programme. Industrial install without it almost always costs more in rework.

Can we buy the chiller first?

You can — then learn pumps cannot deliver and FCUs scream. Design is cheaper than swapping the machine next season.

Formal HVAC pack for review?

Working stage for install — yes. Stamps and codes are in the contract if review is required.

Industrial vs domestic design?

Pumps, water, controls, standby, 24/7. A split is not a factory calc.

Do you coordinate with ventilation?

Yes. Air handling and cooling are one heat balance.

Design fee?

From area, zone count and scheme. A figure follows the survey.

Need a quote or installation? We reply within an hour on business days. Engineer visit and survey are free with a signed contract.